Heavy-duty hydrogen refueling,
where the throughput is real.

Buses, trains, trucks and municipal fleets. The vehicles that move to hydrogen first, because they run enough kilometres to make the station pay off. EDC engineers the complete refueling plant around them.

20211014 124018
Why heavy-duty first

A station is a big investment. It needs volume to make sense.

Hydrogen refueling only works economically when enough vehicles pass through the dispenser every day. That is why EDC does not chase tiny fleets. We build for depots and lines where the throughput is there: city buses, regional trains, truck corridors and municipal utility fleets. High demand, predictable duty cycles, and a clear business case.

Every plant is assembled from EDC building blocks and tuned to the fleet: 350 bar, with cooling only where the duty cycle needs it, storage sized to peak demand, and automation that keeps the depot moving.

Typical heavy-duty setup
Pressure350 bar (heavy-duty)
CoolingOnly where the duty cycle needs it
ThroughputSized to fleet peak demand
StorageCascade + buffer
ProtocolSAE J2601
ControlEDC in-house automation
Segments

Four heavy-duty segments, one engineering partner.

The same building blocks, configured for the duty cycle of each fleet.

Buses

Depot refueling for city and regional bus fleets, the anchor use-case for public transport operators and municipal utilities.

Trains

Train refueling systems for regional lines. Hydrogen train fueling is already in operation as live commissioning proof.

Trucks

Refueling for heavy goods vehicles and logistics corridors, where long range and fast turnaround rule out long charging.

Municipal utilities

Stadtwerke and municipal operators running mixed fleets, often with access to funding and a mandate to decarbonise.

Why EDC

We are in the room before the tender is written

Heavy-duty projects are won or lost at the planning stage. Bring us in with your engineering firm early, and we design the plant that costs less and performs better, not a standard box priced after the spec is frozen.

Engineered, not ordered

Configurable dispensers, storage and automation, tuned to your duty cycle. If cooling or capacity is overkill for your case, we say so.

From concept to first fill

EDC handles engineering, development and commissioning under one roof, with our own crews taking the depot live.

Built from

The blocks behind a heavy-duty station.

Block

350 bar, high-flow for large vehicles.

Block

Mobile 640 bar storage sized to fleet peak demand.

Block

Automation that keeps the depot moving, commissioned worldwide.

FAQ

Heavy-duty hydrogen questions

Stations built for high-throughput fleets such as buses, trains, trucks and municipal vehicles, typically 350 bar, with cooling only where the duty cycle needs it.

A station is a major investment, so it needs enough daily volume to pay off. Bus depots, train lines and truck fleets deliver that throughput, which is why EDC focuses on them rather than very small fleets.

Yes. EDC delivers train refueling systems and has hydrogen train fueling in operation as commissioning proof for the heavy-duty segment.

That is exactly when to talk to us. Bring EDC in alongside your engineering firm at the planning stage and we design a plant that is cheaper to build and better to run.

Contact

Moving a fleet to hydrogen?

Tell us the vehicles and the depot. An EDC engineer comes back with a plant concept, not a price list.